Working One Job At a TimeBathroom Remodeling Timeline

OC Contractor Bathroom Remodeling works just one job at a time. Your project takes top priority and we won't pull off of your job to work on other projects. Our state-licensed working foreman is on your job every day attending to all details so you don't have to.

 

Planning, scheduling, and selection of materials takes place 2 - 3 weeks prior to beginning construction. OC Contractor will be with you every step of the way, from our first meeting, through product selection, and completion of construction.

 

Day 1 Bathroom Remodel Timeline

  • Dumpster arrives
  • Place protective drops and plastic
  • Remove items
  • Repair wood damage
  • Plumbing
  • Electrical
  • Prepare floor
  • Install shower pan or bathtub
  • Greenboard walls
  • Clean up

Day 2 Bathroom Remodel Timeline

  • Install vanity cabinet
  • Finish electrical
  • Install walls around shower or tub
  • Repair/patch walls
  • Clean up

Day 3 Bathroom Remodel Timeline

  • Finish walls around shower or tub
  • Install plumbing fixtures, support bars
  • Install sinktop, bowl, faucet
  • Install medicine cabinet, mirrors, light fixtures
  • A1 Shower Door measures for glass enclosure
  • Clean up

Day 4 Bathroom Remodel Timeline

  • Install flooring
  • Install baseboards
  • Install toilet
  • Install remaining odds and ends
  • Clean up

Day 5 Bathroom Remodel Timeline

  • Install toilet (if the flooring was tile)
  • Install baseboard (if the flooring was tile)
  • Clean up
  • ALL INSTALLATIONS COMPLETE

 